Octa's transportation blog

Comment Period Extended to May 10 on Metrolink Serra Siding Extension Project

The deadline to submit comments on Metrolink’s Serra Siding Extension Project Notice of Preparation (NOP) has been extended to Monday, May 10, 2021. The project proposes to extend 1.2 miles of railroad siding track from Victoria Boulevard to Beach Road in the City of Dana Point and replace the existing single-track railroad bridge over Coast Highway with two single-track bridges.

The proposed project, which is in the environmental phase, would provide safer and more reliable train service. Metrolink is preparing an Environmental Impact Report (EIR) and is seeking comments regarding the scope and content of the document.

You may share written comments by:

  • Email: SerraSiding@octa.net
  • Mail: Chris Haskell
    SCORE Deputy Program Manager
    900 Wilshire Boulevard, Suite 1500
    Los Angeles, CA 90017

For more information about the project or to sign up for email alerts, visit here.