Metrolink will be out of service throughout the entire system for four days starting on Tuesday, December 26 through Friday, December 29. Regularly scheduled service will resume Saturday, December 30. During the closure, Metrolink will clean, repair and upgrade the rail network, including a new signal system that will provide better operational throughput and reliability in and out of Union Station for trains.
For more information about the closure, visit here.
Metrolink is not providing alternative transportation but is collaborating with other transportation agencies. However, the Amtrak Pacific Surfliner will operate with modifications in Los Angeles County. Travelers can ride the Pacific Surfliner along the Orange County Line with a valid Pacific Surfliner ticket. During the track closure, the Pacific Surfliner will bypass Union Station and travel along the east bank of the Los Angeles River and through part of the Alameda Corridor. Learn more here.